Idris Participant

The DPC point is the one that gets ignored the most on Nigerian construction sites. Contractors will cut that corner without telling you and you will not feel the consequences until two or three rainy seasons later when the damage is already deep. Anyone building right now should physically confirm this was done before the walls go up.